Machine Room Commissioning, Start-up Sequence, Acceptance Checklist & Operation Log

Machine room commissioning is the final verification of the whole refrigeration system after installation, before formal handover. Standard start-up sequence: visual inspection → leak test → vacuum → refrigerant charging → oil check → single component test → load running. Leak test: pressurize with dry nitrogen, hold pressure and detect leak; vacuum target below 500 microns for POE oil system. Charging: charge liquid refrigerant into receiver side; never charge liquid directly into compressor suction port. Commissioning key parameters: superheat, subcooling, condensing pressure, suction pressure, oil level, defrost termination temperature. Xiteliduo provides commissioning checklist, operation manual and alarm troubleshooting document together with equipment. Acceptance items: temperature stability, pull-down time, running current, noise, vibration, all alarm function test. Operation log record: daily room temperature, pressure, ambient temperature, running hour, alarm event and maintenance action. Training for end user: normal operation, alarm judgment, forbidden operation, safe pump down procedure and refrigerant handling. Handover standard: all test data recorded, drawings updated as-built, spare parts list submitted. Refrigeration maintenance & repair company recommends 72 hours continuous load running test before final acceptance.

FAQ

  1. What is the correct order before refrigerant charging? Pressure leak test and vacuum pumping.
  2. What is the vacuum target for POE oil system? Below 500 microns.
  3. Where to charge liquid refrigerant? Receiver side.
  4. What core parameters need recording during commissioning? Superheat, subcooling, suction and condensing pressure.
  5. How long is the suggested continuous load test? 72 hours.
  6. What log content should be recorded daily? Temperature, pressure, running hours and alarms.
  7. What must be tested before acceptance? All protection and alarm functions.
  8. What document should be handed over to customer? As-built drawing, manual, checklist and spare part list.
url: https://www.xtldcool.com/news/835.html

Obtain product customization plans online

Please fill in the requirements in the box below, and you will be able to obtain it for free.

Consulting Hotline

+86-18157593311

Xiteliduo & Chuanli

China Source Factory of R32 Semi-Hermetic Piston Compressor & Custom Turnkey Industrial Refrigeration System. Self-developed compressor + complete refrigeration solution, stable performance for tropical & ultra-low temperature working conditions.

connect us

Technical Services: +86-575-83665888;83068555 
Compressor Hotline: +86-18157593311 
Electric Heating Tube Hotline: +86-13857577938 
Email: helenliu1983xtld@gmail.com
Electric Heating Tube Factory: No. 150, Donghu Village, Ganlin Town, Shengzhou City, Shaoxing City 
Compressor Factory: No. 679, Dongguo Economic Development Zone, Shengzhou City, Shaoxing City

Copyright © 2026 Zhejiang Xitelidu Environmental Technology Co., Ltd. & Shengchuanli Environmental Technology Co., Ltd. All Rights Reserved.